<br><br><div class="gmail_quote">On Mon, Feb 1, 2010 at 11:45 AM, Garrick <span dir="ltr">&lt;<a href="mailto:garrick@usc.edu">garrick@usc.edu</a>&gt;</span> wrote:<br><blockquote class="gmail_quote" style="border-left: 1px solid rgb(204, 204, 204); margin: 0pt 0pt 0pt 0.8ex; padding-left: 1ex;">
The purpose of &quot;complete&quot; is so the scheduled can read why a job has exited. For that end, the current behavior is correct.<br></blockquote><div><br>I can see a running job that gets qdeled end up in the &quot;complete&quot; state so the scheduler can see why the job exited, but doesn&#39;t it seem strange to qdel a job that is in the Q state and have it go to the C state?<br>
</div></div>