<div dir="ltr">Dear All,<br><div class="gmail_quote"><div dir="ltr"><br>I have two types users in my Cluster:<br><br>1. Running serial jobs (single core).<br><br>2. Running parallel jobs (multi core).<br><br>Users running parallel jobs requires the use of an entire machine (8-12 cores).<br>

<br>I would like to configure the queue such that once a parallel job is submitted a machine would not accept any more sequential jobs such that the parallel job can start.<br><br>the situation now is that such jobs wait a very long time till a specific machine is completely empty.<br>

<br>Thanks<br><br>Snir<br><br><br></div>
</div><br></div>